Challenging the London Plan

[14 August] The web site for the Examination in Public now has links to the complete set of submissions made in March and to a new version of the London Plan with ‘minor alterations’ in red. There is also a complete set of the supporting documents – the ‘evidence base’. Thanks to Prof Ian Gordon at LSE for pointing this out.

[2 August 2018] The Web site for the Examination in Public (hearings) on the draft new London Plan has now appeared. Check it frequently for updates to the timetable. We understand that the draft list of proposed Matters for examination and of Participants is not likely to appear until September, though a preliminary note may be published in August and so may be the full set of representations made during the consultations. [See the end of this post for link to most of the community submissions.]

[4 June 2018] The more we digest the 2017 draft new London Plan, its Impact Assessment and other supporting documents, the more alarmed we become for the future of London as an inclusive city. Just Space and its member groups are gearing up to challenge it during the coming months of debate. Update from the GLA follows (but the timetable in these bullet points has since slipped. See our later posts.) :

  • there were 4,000 responses to the consultation draft, including postcard campaigns and Talk London (responses to an online survey);
  • Examination in Public (EiP) Panel of 3 inspectors is now in place and will be announced soon.  It will be serviced by Carmel Edwards, Programme Officer, and Jinder Ubhi, Admin Assistant (Jinder works at GLA);
  • GLA London Plan team aim to forward all the responses to EiP Panel by the end of June, with Mayor’s comments and early suggested changes to the draft Plan;
  • All responses will go on-line in July;
  • The Annual Monitoring Report on the London Plan (normally every Feb) won’t be published until July.
  • The Panel’s draft list of the “matters” they propose to examine in public is  expected in August, when the EiP office will open. This draft list (which also identifies which organisations and individuals will be invited to hearings on each issue) is open to challenge for a short while;
  • Technical seminars will be held in September;
  • EiP hearings are expected to start in November and run through to March 2019.

Just Space will make further postings here, including statements of position on the key issues.  Meanwhile the consultation responses of Just Space, its member-groups and many others are gathered together here. Let us know of any important ones we have missed by commenting below.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s